How Long Does Kitchen Cabinet Installation Take? A Complete Timeline
If you’re planning a kitchen renovation, one of the biggest questions is, “How long does kitchen cabinet installation take?” The timeline varies based on factors like cabinet type, customization, and installation complexity. Whether you’re hiring professionals or installing kitchen cabinets in Coquitlam BC yourself, understanding the process helps you set realistic expectations.In this guide, we’ll break down the complete kitchen cabinet installation timeline, from planning to the final touches.
Factors That Affect Installation Time
Before diving into the timeline, it’s essential to understand the factors that impact how long kitchen cabinet installation takes:
- Type of Cabinets:
- Stock Cabinets: Pre-made and ready to install (fastest).
- Semi-Custom Cabinets: Require some modifications (moderate time).
- Custom Cabinets: Built to order and take longer to manufacture and install.
- Kitchen Size & Layout:
- A small kitchen with fewer cabinets will take less time than a large, complex design.
- Pre-Installation Prep:
- If old cabinets need removal, electrical and plumbing work must be completed first.
- DIY vs. Professional Installation:
- A professional team can complete the job faster than a DIY approach.
If you’re searching for kitchen cabinets in Coquitlam choosing pre-assembled stock cabinets can speed up the process significantly.
Step-by-Step Kitchen Cabinet Installation Timeline
Step 1: Pre-Installation Preparation (1-2 Days)
Before installing new cabinets, you must prepare the kitchen:
- Remove old cabinets (if applicable).
- Check walls and flooring for damage or uneven surfaces.
- Confirm measurements to ensure the new kitchen cabinets fit perfectly.
- Complete plumbing and electrical work before installation begins.
Step 2: Delivery and Inspection (1-3 Days)
Once you’ve chosen your kitchen cabinets in Coquitlam BC the supplier will deliver them. Take time to:
- Inspect all cabinets for damage or defects.
- Sort and organize parts to streamline installation.
- Allow wood cabinets to acclimate to your home’s humidity levels.
Step 3: Installing Upper Wall Cabinets (1-2 Days)
Installation starts with the wall-mounted cabinets.
- Locate and mark wall studs for secure mounting.
- Install a temporary ledger board to support the cabinets.
- Secure each cabinet to the studs, ensuring proper alignment.
Wall cabinets are installed first because base cabinets could get in the way.
Step 4: Installing Base Cabinets (1-2 Days)
Next, the lower cabinets are positioned and secured.
- Check for level flooring and use shims as needed.
- Align and secure base cabinets to wall studs.
- Attach filler strips if necessary for a perfect fit.
For those purchasing kitchen cabinets in Coquitlam, custom base cabinets might take longer due to precise fitting requirements.
Step 5: Countertop Installation (1-2 Days)
Once the kitchen cabinets are in place, the countertops can be installed.
- Measure and cut countertops to fit.
- Secure countertops to base cabinets using adhesive or screws.
- Install sink cutouts and backsplashes (if applicable).
Stone countertops like quartz or granite may take additional time for templating and fabrication.
Step 6: Finishing Touches (1-3 Days)
Now it’s time for the final details:
- Install cabinet doors and hardware (handles, knobs, soft-close hinges).
- Adjust doors and drawers for smooth operation.
- Seal gaps and touch up paint where needed.
- Final cleaning and inspection to ensure a flawless look.
Step 7: Post-Installation Cleanup & Final Walkthrough (1 Day)
Once the kitchen cabinet installation is complete:
- Clean up dust and debris from the workspace.
- Check cabinet alignment and functionality.
- Verify that all hardware is securely attached.
If you’ve purchased high-quality kitchen cabinets in Coquitlam BC, this final step ensures they look perfect and function properly.
Total Time Required for Kitchen Cabinet Installation
Step | Time Required |
Pre-Installation Preparation | 1-2 Days |
Delivery and Inspection | 1-3 Days |
Upper Cabinet Installation | 1-2 Days |
Base Cabinet Installation | 1-2 Days |
Countertop Installation | 1-2 Days |
Finishing Touches | 1-3 Days |
Final Walkthrough | 1 Day |
Total Estimated Time | 7-15 Days |
For stock cabinets, installation may take 7-10 days, while custom cabinets could extend the process to 15 days or more.
The timeline for kitchen cabinet installation depends on the type of cabinets, kitchen size, and installation method. If you want a quicker installation, consider stock kitchen cabinets in Coquitlam BC from a trusted supplier. Planning a renovation? Explore kitchen cabinets in Coquitlam to find the perfect style and fit for your home. With proper preparation, your new kitchen will be ready in no time!